Posted

0 replies · 0 reposts · 1 likes

Welded up a stand to work on the transmission out of my Hyster H80XL forklift. Used a couple 18" lengths of 2.5" punches square tube for the case flange to sit on then a couple of 14.5" pieces of 1-5/8ths tubing between them and four 9" lengths to make legs.

View this post on Gab